Manufacturing · UAE factories

Know what each unit cost, before it ships

Bills of materials, work orders and work centres, tied to stock, purchasing and the books. The cost lands as you produce.

No card needed · AED 99 per user a month after the trial · set-up from AED 2,999
Packing line 1 · this shift1,860 of 2,400 packs● On time for Thursday dispatch
Shrink film · 500 mm2 rolls left · PO sent
Cost per packAED 4.85● Materials + labour + machine
AED 99per user a month, manufacturing and stock included
Multi-level BOMsub-assemblies inside finished goods
Cost per unitmaterials, labour and machine time
About 2 weekslive with our set-up; larger multi-app set-ups 4–8 weeks
alnahda.xrero.com
Good morning, Al Nahda IndustriesThis week
Open manufacturing orders143 due this week
Units finished2,960+6%
Production valueAED 184,300Posted to the books
MO/2026/0187In progressAED 21,550
MO/2026/0188Waits for glassAED 6,120
MO/2026/0185Done · in stockAED 11,640
Dispatch · Thursday3 orders ready to ship
Aluminium 6063 · stockReorder at 500 kg● Draft PO ready
Where the money leaks

Margin leaks between the machines, not on them.

Order, store, purchasing and books each keep their own list, so shortages and price changes surface after the job starts.

  • Shortages show when the order is accepted
  • Every step adds its material and time to cost
  • Finished goods enter stock at real cost
Inside the product

One manufacturing order, everything on one screen

What is reserved, what is missing, where each step stands, what the unit cost so far.

MO/2026/0187 · Window frame 120×150 · 40 unitsIn progress
Components · from the bill of materials
ComponentNeededReservedStatus
Aluminium profile 6063312.0 kg312.0 kgReserved
Clear glass 6 mm72.0 m²48.0 m²24 m² short
EPDM gasket220 m220 mReserved
Corner cleat set160160Reserved
Sub-assembly · sash 60×1404016MO/2026/0188
Work orders

Cutting · Saw line 1Done · 3 h 10 min

Assembly · Bench 24 h of 6 h

Glazing · Bench 3Waits for glass

Packing · DispatchThursday

ComponentsAED 18,640.00
Labour and machine timeAED 2,910.00
Cost per frame (40)AED 538.75
Sales order · S00921Al Reem Glass & Aluminium● Delivery promised 16 Oct

Off the line and into stock, at real cost.

Lot numbers follow every carton.

Lathe 2 · today6 h 40 min running
Work centres

Every machine with its capacity, rate and queue

The routing says which machine does each step and for how long. Operators start and stop it on a tablet.

  • Planned against actual time for each step
  • Stops recorded with a reason
Replenishment · this week3 MOs · 2 RFQs created
Planning

A planning board that updates itself

The magnets on the wall show what someone moved last. In Xrero a confirmed sale or low stock creates the order.

  • Missing components become purchase requests
  • Sub-assemblies get their own orders, in sequence
Everything included

The production tools, and the business around them

Bills of materials

Single or multi-level, with quantities, variants and the operations each product needs.

Work orders

Each routing step on the right work centre, started and stopped by the operator.

Purchasing from shortages

Missing components turn into requests for quotation, grouped by supplier.

Subcontracting

Send components out and receive the finished part back into stock, with the bill.

Lots and serials

Raw materials and finished goods by lot or serial, with expiry dates.

Unit cost into the books

Material use and finished production post to stock and cost accounts as they happen.

How it goes

Start with one product, then the floor

A 30-minute look

Bring one product. We build its bill of materials and run an order.

We load your factory

Products, BOMs, work centres, routings and opening stock; you check the unit costs.

First orders on the floor

We train planners and operators on site; most teams are live in about two weeks.

Pricing

Per user, with set-up sized to you

AED 99 per user / month

AED 83 per user a month on the annual plan.

  • Manufacturing, work centres and bills of materials
  • Inventory, purchasing and sales in the same system
  • Accounting with VAT and corporate tax
  • Arabic and English for the office and the floor
Start your 15-day trial
Optional set-up
From AED 2,999

Our team configures the system, moves in your data and trains your staff. Paid once.

See pricing in detail →

Common questions

Does it handle multi-level bills of materials?

Yes. A finished product can contain sub-assemblies with their own bills of materials, and each gets its own manufacturing order in the right sequence.

Can it plan production from sales orders?

Yes. Make-to-order products get a manufacturing order when the sale is confirmed; others when stock drops below your minimum. Missing components become purchase requests.

How is the cost per unit worked out?

Components at their stock value, plus time on each work centre at its hourly machine and labour cost. You see planned and actual per order.

What does it cost?

AED 99 per user a month (AED 83 annual). Set-up from AED 2,999; factories usually take Growth (AED 4,990, about three weeks) or Business (AED 8,999, four to five weeks).

Bring one product. We will cost it with you.

Start your 15-day trialTalk to us on WhatsApp